Our updated proposals
Select a section to zoom in and find out more:



Existing overhead line
Indicative construction compound
Indicative substation
Indicative temporary tower or overhead line
New gantry
Modified tower or overhead line
Reconductored overhead line
Dismantled overhead line
Indicative cable sealing end compounds
Proposed tower or overhead line
Proposed underground line

Within our draft Order Limits (representing the maximum amount of land required to build the Project), parameters known as Limits of Deviation (LoD) are set out. This means that there is a degree of flexibility into the design so that any unforeseen issues that are encountered following consent can be dealt with. For example, we may need to move the position of a new pylon for geotechnical reasons, such as ground stability. These limits would allow us to move infrastructure on the ground as well as the vertical height of infrastructure.